RFP Geo thermal Ground Loop (HVAC)

on Thursday, October 9, 2008

Request for Proposal:
Data Needed

  • Verticle/Horizontal/Manifold
  • Bore Hole Depth
  • Loop Runs
  • Spacing between Cold Hot Loop
  • Bore Hole Size
  • Pipe Size
  • Bore Hole Spacing
  • Packing material
  • Pipe Material
  • Recirculating Pump
  • Maintenance Cycle to incude costs & Freq.
  • Product Replacement Schedule
  • Component Replacement Schedule (10/50%)
  • Warranty Ratio
  • Heat Pump
  • Air Handler
  • Factors:
  • X Sq Ft = 1 Ton of Air
  • I Ton of Air = Dollars Installed
  • System Tonage Capacity

0 comments:

Bookmark and Share